← All Projects

Seattle Central District Remodel + Backyard DADU

Seattle Central District Remodel + Backyard DADU — Integritas Construction

Seattle Primary Residence Remodel & Backyard DADU (Coming Soon)

Overview

Currently in permitting and planning, this project involves the renovation of an existing 1,900-square-foot home in Seattle’s Central District along with the potential development of a detached backyard dwelling unit (DADU).

The project is being designed with a focus on maximizing land utility, improving livability, and increasing long-term property value through strategic infill development.

Planned Scope

  • Full primary residence remodel
  • Interior and exterior upgrades
  • Utility coordination and infrastructure planning
  • Backyard DADU feasibility and permitting
  • Site optimization for urban infill development
  • Potential separate utility services and access improvements

Project Goals

The primary objective is to modernize the existing residence while evaluating the highest and best use of the property through additional backyard housing density.

Current Status

Pre-construction and demolition

Other Projects

Completed 2024 Tacoma Triplex Conversion – Brewery District
N° 01

Tacoma Triplex Conversion – Brewery District

This project involved the full conversion of a single-family home into a functional, income-producing triplex. Integritas Construction managed the entire process end-to-end, including design, permitting, construction, and lease-up. The scope required reconfiguring the layout to create three independent units, upgrading systems, and bringing the property up to current code while maintaining efficiency and livability across […]

ScopeTriplex
Duration12 Months
LocationBrewery District
Completed 2025 Triplex Renovation – Tacoma Hospital District
N° 02

Triplex Renovation – Tacoma Hospital District

This project focused on repositioning an existing triplex through targeted renovation to improve rental quality and overall performance. One unit was fully gutted and rebuilt, while the remaining units received cosmetic upgrades including new finishes, fixtures, and general improvements. Completed in approximately seven months, the renovation delivered clean, functional units ready for tenants, with a […]

ScopeTriplex
Duration7 months
LocationTacoma General Hospital Area
Completed 2025 Attic Conversion & Primary Suite Addition
N° 03

Attic Conversion & Primary Suite Addition

OverviewThis project focused on transforming an underutilized attic into a fully functional primary suite, adding significant livable square footage and long-term property value to the home. The scope included structural modifications, new stair access, a full bathroom addition, insulation upgrades, electrical work, and finish carpentry throughout the new space. Project Scope– Conversion of unfinished attic […]

ScopeAttic Conversion
Duration3 months