Basement ADU Conversion

Completed 2025 Basement ADU Conversion — Integritas Construction
Scope Basement Conversion
Duration 4 months

Converting Unfinished Basement Space Into a Permitted ADU

Overview
This project involved the full conversion of an unfinished basement into a legal accessory dwelling unit (ADU), creating an independent living space designed for long-term rental income and increased property utility.

Project Scope
– Permitted basement ADU conversion
– Installation of egress windows
– New electrical service and panel upgrades
– Bathroom and kitchen installation
– Plumbing system modifications
– Perimeter drainage improvements
– Waterproofing and moisture mitigation
– Interior framing and finish workKey Challenges
One of the primary technical challenges involved plumbing fixtures located below the elevation of the main sewer line. Specialized drainage and plumbing solutions were implemented to ensure proper long-term functionality and code compliance. The project also required exterior drainage improvements and perimeter drain work to protect the new living space from moisture intrusion.

Outcome
The result was a fully functional, code-compliant basement ADU capable of generating rental income while substantially increasing the usable square footage and overall property value.

Value Creation
This project demonstrates how underutilized basement space can be strategically repositioned into a high-performing asset through thoughtful planning, permitting, and construction execution.

Other Projects

Completed 2024 Tacoma Triplex Conversion – Brewery District – 2347 S J St
N° 01

Tacoma Triplex Conversion – Brewery District – 2347 S J St

This project involved the full conversion of a single-family home into a functional, income-producing triplex. Integritas Construction managed the entire process end-to-end, including design, permitting, construction, and lease-up. The scope required reconfiguring the layout to create three independent units, upgrading systems, and bringing the property up to current code while maintaining efficiency and livability across […]

ScopeTriplex
Duration12 Months
LocationBrewery District
Completed 2024 Triplex Renovation – Tacoma General Hospital Area – 611 MLK
N° 02

Triplex Renovation – Tacoma General Hospital Area – 611 MLK

This project focused on repositioning an existing triplex through targeted renovation to improve rental quality and overall performance. One unit was fully gutted and rebuilt, while the remaining units received cosmetic upgrades including new finishes, fixtures, and general improvements. Completed in approximately three months, the renovation delivered clean, functional units ready for tenants, with a […]

ScopeTriplex
Duration12 months
LocationTacoma General Hospital Area
Completed 2025 Attic Conversion & Primary Suite Addition
N° 03

Attic Conversion & Primary Suite Addition

OverviewThis project focused on transforming an underutilized attic into a fully functional primary suite, adding significant livable square footage and long-term property value to the home. The scope included structural modifications, new stair access, a full bathroom addition, insulation upgrades, electrical work, and finish carpentry throughout the new space. Project Scope– Conversion of unfinished attic […]

ScopeAttic Conversion
Duration6 months